3. Downloads

The latest information such as reports, maps, photomontages etc. will be posted and available for download here.

Photomontages of Proposed Works (September 2017)

Kent Street (Credit Union)

VP1_Montage

 

 

 

Kent Street (Post Office)

VP2_Montage

 

 

 

Croppy Road (West)

VP3_Montage

 

 

 

Croppy Road (East)

VP4_Montage_Zoom_w_People

 

 

Facksbridge

VP5_Montage_w_People

 

 

 

Please note that all visualisations are subject to Specialist design.

 

Update Documents – Uploaded June 2017

EIS Addendum
EIS Addendum – Feb 2017 (15MB)

Natural Impact Statement Rev 1
Natural Impact Statement – Rev 1 Jan 2017 (16MB)

 

Clonakilty FRS Final Report

20150527-332149-EDE-CCW-R005-C – Final Report (5.5MB)

20150527-332149-EDE-CCW-R005-C – Final Report Appendix A (5.5MB)

 

Exhibition Documents:

River Fealge (Clonakilty) Certified Drainage Scheme
Public Exhibition (15th December 2014 to 20th January 2015)

 

Proposed Flood Defence Works – Scheme Layout
20141209-MMD-332149-N-DR-00-XX-0016-P1_EXHIBITIONCOPY

Flood Extent Map
20141209-MMD-332149-N-DR-00-XX-0001-P2_EXHIBITIONCOPY

Flood Works Benefit Map
20141209-MMD-332149-N-DR-00-XX-0002-P2_EXHIBITIONCOPY

Proposed Flood Defence Works (1 of 8) - Ring Road / Croppy Road
20141209-MMD-332149-N-DR-00-XX-0004-P2_EXHIBITIONCOPY

Proposed Flood Defence Works (2 of 8) – Kent Street
20141209-MMD-332149-N-DR-00-XX-0005-P2_EXHIBITIONCOPY

Proposed Flood Defence Works (3 of 8)  – Western Road
20141209-MMD-332149-N-DR-00-XX-0006-P2_EXHIBITIONCOPY

Proposed Flood Defence Works (4 of 8) – Cloheen Cottages
20141209-MMD-332149-N-DR-00-XX-0007-P2_EXHIBITIONCOPY

Proposed Flood Defence Works (5 of 8) – Storage Embankment / The Miles
20141209-MMD-332149-N-DR-00-XX-0008-P2_EXHIBITIONCOPY

Proposed Flood Defence Works (6 of 8) – Storage Area
20141209-MMD-332149-N-DR-00-XX-0009-P2_EXHIBITIONCOPY

Proposed Flood Defence Works (7 of 8) – Kilgarriff
20141209-MMD-332149-N-DR-00-XX-0010-P2_EXHIBITIONCOPY

Proposed Flood Defence Works (8 of 8) – Ballyduvane
20141209-MMD-332149-N-DR-00-XX-0011-P2_EXHIBITIONCOPY

Defence Details – Ballyhalwick Stream and Kilgarriff
20141209-MMD-332149-N-DR-00-XX-0013-P2_EXHIBITIONCOPY

Defence Details – Flow Control Structure
20141209-MMD-332149-N-DR-00-XX-0014-P2_EXHIBITIONCOPY

Defence Details – Kent Street and Croppy Road
20141209-MMD-332149-N-DR-00-XX-0015-P2_EXHIBITIONCOPY

Defence Details – Ring Road
20141209-MMD-332149-N-DR-00-XX-0017-P1_EXHIBITIONCOPY

Environmental Impact Statement
EIS Volume 1 – Non-technical Summary (2.3MB)
EIS Volume 2 – Main Report Part 1 (15MB)
EIS Volume 2 – Main Report Part 2 (14MB)
EIS Volume 2 – Main Report Part 3 (9MB)
EIS Volume 3 – Appendices (13.8MB)

Natural Impact Statement
Natural Impact Statement (12.0MB)

 

River Fealge (Clonakilty) Drainage Scheme – Public Consultation Day (July 2014)

 

South Western CFRAM (Clonakilty) Preliminary Options Report

This report was prepared as part of the SW CFRAM study and outlines the preliminary options for mitigating flood risk in Clonakilty. Under the Clonakilty Flood Relief Scheme, the viabilty of each of the options contained in the report will be reviewed and developed further. The preferred option will be presented at a Public Consultation day during the summer 2014.